sibayak99
Sale Price:$200.00
Original Price:$600.00
sale
The Sibayak area is located in the WKP Gunung Sibayak-Gunung Sinabung, North Sumatra Province, where there is 1 monoblock unit with an installed capacity of 2 MW and 2 PLTP units with a capacity of 2x5 MW. ac 8615 This small-scale PLTP is part of a national priority program to increase TKDN The total installed capacity at this time is 12 MW
Quantity: